Hot strip mills
Roughing and finishing train setup, inter-stand tension and looper control, finishing and coiling temperature, and cobble avoidance on the run-out table.
Hot strip, tandem and reversing cold mills, plate, anneal and temper, pickling and coating, and the coil-handling floor between them. Same platform, different physics, different models.
pass 6/7autonomy: assisted-writetwin delta 0.004 mmaudit id 7f31c
Producers running Steelira across hot, cold and finishing lines
Every plant has one line where a point of prime yield is worth more than the whole subscription. We help you find it, then land there.
Roughing and finishing train setup, inter-stand tension and looper control, finishing and coiling temperature, and cobble avoidance on the run-out table.
Tandem and reversing mills held to micron gauge through acceleration, threading and tail-out, with shape control that anticipates thermal crown.
Crown, wedge and flatness control on heavy plate, with TMCP paths planned for property compliance on structural and line-pipe grades.
Continuous anneal lines, batch anneal and skin-pass control tuned to land mechanical properties without over-processing.
Pickling line speed and acid control, galvanizing pot and air-knife control, coating-weight targeting that stops paying for over-coat.
Robotic strapping, sampling and lab logistics so sample-to-result time stops gating the next campaign.
The loop is the same. The physics, the sensors and the failure modes are not.
A slab goes from 250 mm to 2 mm in seconds while roll force, looper tension, temperature and metallurgy interact non-linearly. Steelira plans the reduction split and TMCP path from chemistry and target grade, then holds the finishing train against the twin's predicted profile rather than the last coil's.
pass 6/7autonomy: assisted-writetwin delta 0.004 mmaudit id 7f31c
Micron gauge across a mile of strip is a control problem the AGC solves reactively and a metallurgy problem it cannot see at all. Steelira predicts gauge deviation from entry profile, roll thermal state and lubrication behaviour, and pre-empts it — while shape control keeps edge-wave and centre-buckle out of the coil.
pass 6/7autonomy: assisted-writetwin delta 0.004 mmaudit id 7f31c
Properties and coating spec are decided by a thermal path and a knife gap, and both are usually run to a recipe written years ago. Steelira controls line speed, furnace zones, skin-pass elongation and coating weight against a predicted property and coating outcome per coil.
pass 6/7autonomy: assisted-writetwin delta 0.004 mmaudit id 7f31c
The plant director signs it, the roller trusts it and IT/OT approves it. All three have to be true.
Prime yield, energy, throughput and consistency, expressed as a hard ROI in a paid pilot with a baseline you agreed before we arrived. No transformation programme, no eighteen-month integration.
The agent proposes, you dispose — until you decide otherwise. Every recommendation shows the coil history and the twin's reasoning, and your corrections are the training signal that makes it better.
Predicted gauge, flatness, surface and properties per coil, with an immutable audit trail that survives a customer claim and cites the grade spec it reasoned from.
A single point of prime yield on a 1.2 Mt/yr line is worth far more than a Line subscription. That asymmetry is the entire commercial argument — and we make you prove it in shadow mode before you pay for autonomy.
[PLACEHOLDER] Targets used for pilot design; actual results are contracted per site against your measured baseline.
A deliberately slow ramp on purpose: trust before autonomy.
90 minutes with your rolling, quality and OT leads. We map the line, the systems and the losses, and pick the wedge workflow.
Six to eight weeks reading only. We baseline prime yield, energy and scrap, and score the model against your actual coils.
The agent recommends; your engineer approves every move. Accuracy and ROI are proven on real production.
Low-risk loops go auto first, then the mill — each promotion gated on measured performance and signed by your team.
Steelira does not replace your Level-2, your AGC or your inspection system. It makes them act together.
“We ran Steelira in shadow for eight weeks on the tandem mill. It called eleven of the twelve off-gauge tail events before our AGC reacted. That was the moment the argument ended.”
“Our best roller retires in two years. Steelira is the first system that captured how he sets up a hard automotive grade — and then explained why, with the coil history to back it.”
“Prime yield moved 1.7 points on the galvanizing line and reheat gas fell double digits. Nothing else we bought this decade did both.”
Usually not for the wedge workflow. Most lines already have gauges, shape-meters, pyrometers and surface inspection. Where a line is genuinely blind — often vibration for chatter work — we specify the minimum addition, typically one accelerometer per stand.
The one with the highest product of tonnage, coil value and known loss. In practice that is usually the tandem cold mill or the galvanizing line, but the mill assessment answers it with your own numbers.
No. Steelira writes setpoints through your Level-2, inside clamps your engineers set, and falls back deterministically to your existing setup on any watchdog timeout. The AGC keeps doing its job; Steelira stops handing it problems.
Aluminium flat-rolled is supported on the same platform with different property and surface models. Long products are on the roadmap and out of scope today.
Bring your rolling, quality and OT leads to a 90-minute mill assessment. You leave with a ranked list of workflows by expected payback — whether or not you buy anything.